Every Evergreen core is manufactured through a controlled sequence of operations, from slitting of the raw coil to packing of the finished core. Quality is verified at each stage to ensure consistent and dependable transformer cores.
The Production Flow
- 1
Slitting
Wide CRGO and CRNGO coils are slit into strips of the required width. Quality control begins at this stage.
- 2
Cutting As Per Drawing
Strips are cut at 90° or 45° in accordance with the customer's drawing, then punched and V-notched to the required geometry.
- 3
Coating
Cores are given an insulating coating to protect the electrical steel against corrosion.
- 4
Pre Core Assembly
Laminations are stacked and assembled into a finished core with overlap or step-lap joints.
- 5
Testing
Each core is inspected and tested for pre core loss and dimensional tolerance, and a test certificate is issued with every despatch.
- 6
Packing
Cores are packed as leg or sheet packets in wooden boxes or on pallets to ensure safe transit.